The Planning Fallacy
Students predicted that their thesis would take far less time than it did, even when they knew that similar projects ran late.
2 min read · Level 3 · Vidyaa Editorial
In 1994, the Journal of Personality and Social Psychology published a paper by Roger Buehler, Dale Griffin and Michael Ross.[1] It begins with a building. In 1957, the Sydney Opera House was expected to be finished in early 1963 for $7 million. A smaller version opened in 1973 and cost $102 million.[1]
The authors define the planning fallacy as a tendency. People hold a confident belief that their own project will go as planned, even while knowing that most similar projects have run late.[1]
They tested this with psychology students who were writing an honours thesis at the University of Waterloo.[1] Each student predicted when the thesis would be finished. The 33 students who had finished when the records closed predicted 33.9 days on average, but they took 55.5 days.[1] Fewer than one third finished within their prediction.[1] Even the pessimistic prediction of 48.6 days was too short.[1]
In a later study, the optimistic bias disappeared for students who connected their predictions with relevant past experience.[1] This suggests an application: before estimating a task, recall how long similar tasks took. The study did not test this advice for every kind of task.